Tuesday, December 21, 2010

FIBER BREAKDOWN @ SUNGAI PETANI (ADSS CABLE)

The team escalate to affected site on 9th December 2010 to rescue the fiber cut @ Sungai Petani, Kedah. This network belong to Fibrecomm which utilized the TNB pillon facilities

1. Affected site along the TNB pillong. Cable preparation in progress

2. Setting up and closure preparation

3. Power supply supported by portable genset

4. Splicing work start

5. Completing 24 cores straight joint

6. TNB support staff attending and supervise our job

7. Coiling fiber into designated trays

8. Locking back the closure

Job done !!







FIBER INSTALLATION & SPLICING FOR NEW E&O COMMERCIAL BUILDINGS @ TG BUNGAH, PENANG

After several times of project delays, our team has completed the fiber installation job for this new E&O commercial building "SERI TANJUNG PINANG" at Tanjung Bungah, Penang. The scope of work including supply, install and terminate. We took overall six days to completed this project


















Job completed !!












FIBER TERMINATION @ PPD PENANG

This splicing job was done on 8th December 2010 at one of the PPD, Penang. The scope of work was to terminate 4 cores multimode fiber to pigtails at both ends.

1. The OFC 4 core multimode cable and pigtails were prepared into patch panel

2. Strip the fiber pigtails

3. Set the splicing machine into multimode setting

4. Start splicing with pigtails accordingly

5. Arranged the fiber and pigtails properly

6. Ensure all the fibers were properly arranged to avoid macro-bending

7. Rackmount the patch panel into the rack

Its done!!







Monday, December 20, 2010

YEAR END SALES 2010 : MEDIA CONVERTER STOCK CLEARANCE !!

Get now our lowest price offered 

1. FIBER OPTIC MEDIA CONVERTER 10/100 MBPS WITH DUAL SC PORTS (BELOW 2KM)


Fiber to UTP 10/100 Mbps duplex SC (<2km)

FOR SINGLEMODE FIBER    = RM150.00 / EACH
FOR MULTIMODE FIBER    = RM150.00 / EACH
Flat price offered now !!

Fiber to UTP 10/100/1000 Mbps duplex SC (<2km)

FOR SINGLEMODE FIBER    = RM320.00 / EACH
FOR MULTIMODE FIBER    = RM320.00 / EACH

Flat price offered now !!

YEAR END SALES 2010 : GET THE CLOSURE STOCK NOW !!

We have been around the end of the year 2010 corner. Soul Communication Sdn Bhd todays launching its stock clearance and its time to get it at the bottom price!

ORIGINAL TYCO ELECTRONICS FIBER OPTIC OUTDOOR CLOSURE FOR 96CORE SPLICING TRAY @ RM500 EACH

17 UNIT STOCK LEFT

Model : FOSC-40082 & B4

Original standard packaging include :

1. Outdoor enclosure set with 4 small & 1 big cable entries
2. Nine splicing tray
3. One unit 2NT heatshrink and coupling
4. Two pieces of aluminium paper
5. One unit sand paper
6. Two sets cleaning tissues
7. One unit velcro strap
8. Manual instruction

info@soulcommunication.com.my  / 013-488 2800 (Asrul) / 04 - 448 0624

Saturday, December 11, 2010

Fiber cut - Attending breakdown for Maxis

A rescue team was mobilize to attend fiber cut / breakdown last week for Maxis @ Jln Langgar, Kedah.
The network restored back after temporary joint introduced. The cable cut was done by local contractor doing the road upgrading project at Jln Langgar, Kedah

Photo 1 : The 48core cable damaged

Photo 2 : Existing underground infra damaged

Photo 3 : Site preparation for repair

Photo 4 : Preparing the fiber optic closure 

Photo 5 : Close up on closure preparation

Photo 6 : Cable length constraint. Splicing to be perform on the ground

Photo 7 : Securing the damaged area to prevent further incident in near future. 

Temporary fiber splicing done!



Fujikura S60 Fusion Splicer Machine Set

GET COMPLETE UNIT OF FUJIKURA 60S SPLICING MACHINE WITH ONLY
RM29,200


FSM 60S SPLICING MACHINE

-Standard core alignment splicing machine
-Single core splicing 
-Newly rugged construction improved :
   1. Resisting shock
   2. Resisting dust
   3. Resisting with rain
   4. Withstand with 30" drop test

-Splice fiber in 9 seconds
-Heat a 60mm protection sleeve in 30 seconds
-Automatic tube heater operation
-Automated monitor image orientation
-Battery charge capability during splicing
-Splice data can be downloaded via new software


Contact us to book your unit now. Cash term applied
asrul@soulcommunication.com.my
013-4882800



Sunday, November 21, 2010

Fiber optic installation for REDTONE - Penang

Our team has completed the fiber optic indoor installation for REDTONE @ Menara Boustead, Penang recently in August 2010. The scope of work including supply and install fiber optic cable from rooftop down to their clients / POP office.


1. Pulling the fiber cable into one of the last-mile fiber termination point


2. Proper piping required to avoid the fiber cable bending during installation by other contractors in the near future


3. Securing tie the cable onto the existing overhead open truncking


4. Ensure the cable conduit is well tagging to avoid misunderstanding in future


5. Terminate the fiber cable with pigtails with fusion splicing method


6. Perform the optical testing using OTDR to confirm its link status


7. One of the last-mile fiber termination point completed


8. The main rack completed with fiber connectivity and its media converter