We are proud that our little blog has received visitors from nine (9) countries including ours; Malaysia.
We always treat our blog as a knowledge platform to share with all readers out there. In this part 4, we would like to share on our experience involving in Fiber-To-The-Home termination works.
In Malaysia, this FTTH project was lead by our giant telco company, Telekom Malaysia Berhad (TM).
Below are step-by-step in performing fiber termination work for outdoor distribution panel.
Step 1 : Cutting the outer jacket of fiber optic cable
Step 2 : Remove the outer jacket of fiber optic cable
Step 3 : Pulling out the nylon rope inside the cable to the desired length
Step 4 : Pulling out the loose tube through the nylon rope line
Step 5 : Cutting out the strength member
Step 6 : Clean up the loose tube using approved cleaner and tissues
Step 7 : Put the cable end to the desired incoming cable port
Step 8 : Lock the cable and strength member with screw
Step 9 : Coil the unused / spare loose tube first
Step 10 : Strip the loose tube using the tube cutter
Step 11 : Pull out the loose tube and clean up the dark fiber
Step 12 : Setting up the dark fiber and pigtail using fusion splicing machine and splice
Step 13 : After splicing done, coil the excess dark fiber on the tray
Step 14 : Fiber termination work done and lock the distribution panel properly
Step 15 : Bring up the panel to the pole location
Step 16 : Terminate the panel using stainless steel tie onto the pole
Step 17 : Coil the cable and tie it with jubilee clip. It's done!