As usual, temporary bypass with two (2) additional joints was made to ensure their downtime is minimal.
Splicing the first joint
Splicing the second joint
Splicing work in progress
Location of damaged site
Another side view of damaged site
Locating missing manhole using metal detector
Missing manhole found. Unnoticed without using the metal detector