Monday, March 10, 2014

INSTALLATION OF CONCRETE POLE ALONG JKR RESERVED

Update from our daily activities:

-Concrete pole installation for temporary cable diversion due to JKR project

-Area where new bridge is being built. Existing underground cable need to divert temporarily

-Tighten up the concrete pole with safety harness

-Lifting concrete pole using crane

-Temporary lifting to work area

-Concrete pole lifted at open space area

-Lifting another concrete pole

Area where concrete pole to be erec

-Using backhoe to digging hole

-Limited working space for backhoe

-Backhoe start lift up concrete pole and erect 

-Erecting concrete pole in progress

-Erecting concrete pole in progress

-Erecting concrete pole in progress

-One of the concrete poles erected at site