Sunday, July 4, 2010

Installation of pedestal plinth @ Jln Kebun, Shah Alam

The installation of HSBB for Jln Kebun, Shah Alam was completed for some schemes in April 2010

1. Pre-cast concrete plinth mobilise to site


2. Hacking existing concrete foundation and a make rectangle hole

3. Wall coring on existing manhole to allow for 2 way PVC long bend pipes

4. Plastering the plinth and existing manhole and let it dried first

5. A snapshot of completed plinth for pedestal


6. Drill the concrete to allow for 2 unit steel wall plug


7. Installation of pedestal onto the plinth and prepare for termination

8. Works completed

2 comments: